Virya US Grid Explorer · HIFLD, EIA, EPA eGRID, DOE

Who owns the wires, who serves the load, and where the plants sit.

95,000 transmission lines, 1,568 power plants, 2,931 utility service territories, 95 planning areas and 26 related layers on one map, plus the emission intensity of US power (EPA eGRID, 2014 to 2024) by eGRID subregion and balancing authority. Click anything to see what it links to: a utility's lines and plants, a planning area's utilities, a holding company's subsidiaries.

US Grid Explorer FAQ

What does the US Grid Explorer show?

The US power grid on one map: 94,619 transmission lines by voltage, 1,568 power plants by fuel, 2,931 retail utility territories, 2,880 holding company areas and 95 HIFLD planning areas, plus 26 energy, environmental and infrastructure layers. The Emissions tab colors the map by the emission intensity of electricity generation from EPA eGRID.

How are the layers linked?

Each utility is tied to its planning area and holding company, transmission lines to the utilities that own them, and power plants to their utility through the EIA utility ID. Select a planning area to show only the utilities inside it, or a utility to show only the lines and plants it owns.

Where does the data come from?

Public US government datasets: HIFLD, US EPA (FRS, TRI, RMP and TSCA), EIA-860, the DOE Alternative Fuels Data Center, FAA, FCC, FDIC, USGS and USACE. The power plant layer is a subset: the 1,568 EIA-860 plants matched in the EPA Facility Registry, not the full US fleet.

Is the US Grid Explorer free?

Yes. It opens after a one-time email check: enter the 6-digit code sent to your inbox, and the browser stays signed in for 7 days across all Virya sites.

Are the 95 planning areas the same as balancing authorities?

No. The layer has 95 HIFLD electric planning areas. EPA eGRID2023 counts 66 US balancing authorities. 53 of the 95 polygons can be matched to one of them (49 by their own code, 4 by hand), and they cover 50 of the 66. The rest are utilities, cooperatives or older areas inside a larger balancing authority, or have no code.

What does the emission intensity layer show?

Pounds (or kilograms) of CO2, CO2e, methane, nitrous oxide, NOx and SO2 emitted per megawatt-hour of net generation, from EPA eGRID for 2014, 2016 and 2018 to 2023, by eGRID subregion or balancing authority, plus EPA draft PM2.5, ammonia and VOC rates for 2018 to 2021. 2023 is the latest year EPA has published; 2024 comes from Cornerstone's run of EPA's eGRID code, is marked as not an EPA release, and leaves out SO2. Rates count the plants located in an area and leave out imports and grid losses.

What does the ERCOT prices tab show?

Real-time and day-ahead power prices for ERCOT's eight load zones and its trading hubs, from ERCOT's Public Data API, January 2022 onward. The map colors the load zones by a year's average real-time price, real-time minus day-ahead, or daily battery spread (the day's two highest hourly prices minus its two lowest). Click a zone or hub for a heat map of every hour, or every day, of the year.

Updated

Emission intensity: method and data notes

Source

EPA's Emissions & Generation Resource Integrated Database (eGRID). eGRID combines EIA-923 generation and fuel use, EIA-860 plant data and the emissions that power plants monitor and report to EPA under 40 CFR Part 75, and estimates the rest from fuel use and emission factors. The latest edition is eGRID2023 (revision 2, June 2025), built on 2023 EIA data. EPA had not published eGRID2024 by 23 October 2026, so 2024 comes from Cornerstone's run of EPA's own code (below). History comes from EPA's eGRID2014, 2016 and 2018 to 2022 files (eGRID was published every two years before 2018).

What a rate means

The total output emission rate is an area's annual emissions divided by its annual net generation, in pounds (or kilograms) per MWh. Biomass CO2 counts as zero and combined heat and power plants keep only the share of emissions that makes electricity, as in eGRID. Rates are at the point of generation: they count the plants located in an area, not the power its customers import, and leave out transmission and distribution losses and upstream fuel emissions. A subregion card also shows the rate per MWh delivered, using EPA's grid gross loss for the interconnection, as EPA's Power Profiler does. The non-baseload rate weights plants by how rarely they run (all output of plants under a 20% capacity factor, none above 80%). EPA offers it for estimating emissions avoided by efficiency or renewables, not for carbon footprints.

How the numbers were checked

Every rate was recomputed from eGRID's mass emissions and net generation for the US, each subregion and each balancing authority in all nine years, and each matches EPA's published rate within rounding. Subregion and balancing-authority generation each add up to the US total. Two series were made comparable: eGRID2014 published CH4 and N2O rates in lb/GWh (converted to lb/MWh here), and EPA's CO2e uses different warming potentials by edition (SAR through eGRID2016, AR4 for 2018 to 2022, AR5 for 2023), so CO2e here is recomputed with the AR5 values (CH4 28, N2O 265) in every year.

2024 from Cornerstone

Cornerstone ran the development branch of EPA's open-source eGRID code (github.com/USEPA/egrid, commit 8932a07) on EIA and EPA data retrieved on 11 March 2026 and published the output on Zenodo (record 18968658, version 1.0.0, 17 March 2026, CC BY 4.0). It is not an EPA release and EPA has not reviewed it. Cornerstone says it checked that the code reproduces eGRID2023 but did no quality assurance of its own. The file has the same 27 subregions and 66 balancing authorities as eGRID2023, its rates follow from its masses, and its generation adds up to the US total. It is in metric units, converted here. 2024 carries an asterisk on the year slider, hollow dots in the charts and a note in every card. US CO2 is 747.9 lb/MWh in 2024 against 767.2 in 2023 (2.5% lower). Three things differ from EPA's years:

Balancing authorities on the map

eGRID assigns each plant to a balancing authority from EIA-860 but publishes no boundaries, so balancing authorities are drawn on the HIFLD planning-area polygons whose code matches. Of the 95 polygons, 53 can be matched to one of the 66 balancing authorities in eGRID2023: 49 by their own code and 4 by hand. Sierra Pacific's polygon is shown with NV Energy's single balancing authority (NEVP); the Alabama Power, Georgia Power and Mississippi Power polygons with the Southern Company balancing authority (SOCO); and HIFLD's combined PacifiCorp polygon with PACE and PACW added together. That covers 50 of the 66. The other 16 balancing authorities, such as Avangrid Renewables, Hawaiian Electric and the Southeastern Power Administration, appear only in the ranked list. Where polygons overlap, the smaller one is drawn on top.

Draft PM2.5, ammonia and VOC

EPA published draft estimates of primary PM2.5, NH3 and VOC for 2018 to 2021 from the National Emissions Inventory but has not added them to eGRID. Here the subregion totals are rebuilt from the drafts' plant sheets and divided by eGRID's generation for each year, because the drafts' own subregion sheets contain the errors listed below. National PM2.5 roughly halves in 2020 (0.089 lb/MWh in 2019, 0.050 in 2020, 0.060 in 2021) and VOC in 2018 is about 2.4 times later years; the drafts do not explain these steps, so compare those years with care.

Errors found in the source files

ERCOT prices: method and data notes

Source

ERCOT's Public Data API: real-time settlement point prices (NP6-905-CD, every 15 minutes) and day-ahead settlement point prices (NP4-190-CD, hourly) for the trading hubs and load zones, from January 2022. Where ERCOT posted an interval more than once, the latest posting is used. The data were pulled for Virya's battery-bidding benchmark and are summarized here, not redistributed as raw files.

Measures

Hours are hour-ending Central Standard Time all year (UTC-6), so every day has 24 hours and the daylight-saving changes neither drop nor repeat an hour. For price and battery spread, the map's classes are quantiles of every zone's yearly value across all years, so colors compare from year to year. For real-time minus day-ahead they are fixed bands centered on zero, blue where real time came in cheaper. The heat maps use fixed price bands. The latest year is a part year, marked with an asterisk.

Load zones on the map

ERCOT publishes its load-zone map only as an image. The outlines here were traced from that image (ERCOT media kit, June 2023) after lining it up with the Census outline of Texas, so they are approximate, especially where a zone boundary runs between counties. The North, South, West and Houston zones cover the competitive areas. The Austin Energy, CPS Energy, Lower Colorado River Authority and Rayburn Electric Cooperative zones are the loads those utilities serve, so the LCRA and Rayburn zones are scattered patches inside the others. Parts of Texas outside ERCOT (the Panhandle, El Paso and East Texas) are not colored. Trading hubs are averages of ERCOT's 345 kV buses in each region and have no outline; they appear in the panel list.